Simulate all control functions shorting across pilot device terminals an external Actuator shall be flush with body circuit breaker
SECTION 16900
Controls and Instrumentation
Part 1 - GENERAL
DESCRIPTION
Work includes fabrication, testing of ___ integrated control panels, and shipping to the jobsite as specified, and shown on the drawings for the control and protection of all motors and controlled equipment in conformance with manufacturer's recommendations and applicable codes.
Sample Operation and maintenance manuals for reference in preparing submittals are available at: http://www.fs.fed.us/database/acad/elec/o&mmanuals/ommanuals.htm
Note these sample submittals are from a collection of projects and not all Materials for this project are shown. These are to aid in preparation of required contract submittals.
All items shown in the contract drawing shall be supplied by the Contractor except those items specifically labeled "NIC" or "GFP" in the drawings are not in this contract.
Contractor shall furnish all components shown on the contract drawings including the following, which shall be furnished by the Contractor, but installed by others:
This section of the specification applies to all motor controls specified herein.
Manufacture and test the control systems in accordance with all applicable sections of Division 16.
QUALITY ASSURANCE
All control systems shall be the product of one manufacturer who in the past |
See all the reviews